
The Grid Shield for AI Data Halls.

Volt is defining how very large loads connect to the grid. Our patented Core MV is a medium-voltage UPS that acts as a buffer, shielding the campus from grid faults, and the grid from campus swings. With several gigawatts now being built, we make grid-friendly data centers real today.

Utility-grade fault ride-through
View test dataCore MV is tested beyond every new ride-through rule now being written, giving AI campuses power the grid can trust.
Why Volt
Financeable Hardware, Tier-1 Parts
Made from Tier-1 parts and covered by 20-year warranties.
Gigawatt-Ready Supply Chain
Tested, scaled and ready to ship to sites worldwide.
Domestic Assembly, Fully Traceable
Designed and assembled in our own U.S. plants.
Redundant by Design
Engineered for the strictest uptime and resilience targets anywhere.
Customer voices
We tested every serious option on the market. Volt’s Core MV was the only system that cleared the full interconnection and reliability bar, and their engineers were the strongest team we met. We expect it to become the standard way AI campuses connect in this country.
Working with Volt has been easy from the first call. Like any large build we hit hard moments together, but their people clearly come from serious engineering stock. The care and precision on the Volt side made a complicated process feel calm and well run. We are already planning the next several projects with them, and we expect many more to follow after that.
I enjoy walking utilities and site owners through this system, because it does more than meet ride-through rules, it clears them by a wide margin and grid operators like it. It lets us be a good neighbour on the grid.
Our expertise
One Mission: Power for AI, only.
Hardware and control software shipped as one engineered system, removing integration guesswork and the hand-off risk built into patchwork designs.
Our performance
Results Proven in the Field
Core MV is a medium-voltage UPS tested at an independent national lab, aligned with new grid codes and now being built at scale.
Volt in numbers
3GW
3 GW+ Running or Being Built
Supplying battery storage and continuous power to AI campuses, critical facilities and the wider grid.
99.9 %
99.9% Availability
Tier 4 class performance for critical sites. Best-in-class availability for battery systems.
10+
10+ GW Factory Capacity
Running today and ready to supply the largest builds anywhere.
75+ Sites Across the Americas
More than 15 years of combined field runtime behind every unit.
Latest News
Updates on AI campus power, grid stability and how very large loads connect.

AnnouncementJuly 21, 2026
Northgrid and Volt to Install 5 GW of Core MV™ Across Several Hyperscale Sites
AUSTIN and DENVER, July 21, 2026 — Northgrid, the AI campus builder, and Volt today announced a partnership to power the next…

In the pressOctober 15, 2026
Named to a Leading List of 2026 Inventions
Hyperscalers say grid outages are costly to their business. But their campuses can also cause trouble for the grid itself…
- Should Large Loads Register?November 10, 2026Read more
- A new kind of battery helps data centers get along with the gridOctober 15, 2026Read more
- Six big shifts in compute, chips and core technology for 2026October 6, 2026Read more
- Powering AI is a systems design problemSeptember 10, 2026Read more
- Why Northgrid picked Volt’s medium-voltage Core MV for grid-friendly AI infrastructureSeptember 2, 2026Read more
Contact
Let’s switch it on.
Tell us about your site and load. A Volt engineer replies within one business day.
